General Description
Equipped together with the zero leak bidirectional checking sole-noid valves, this energy unit is created for that operation of two independent circuits. Which are respectively for your principal and subordinate platforms with the double scissors lift. Two cut-off valves are made use of for reducing the machine manually in situation of energy loss. If far more independent circuits are required for your application please make contact with us for availability.
Remark: 1. Please seek advice from our revenue engineer for your distinctive pump displacement, motor energy or tank capability.
2. CSA or UL licensed motors can be found upon request.
Specific Notes
1. The AC motor is of S3 duty cycle, which could only do the job intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean each of the hydraulic parts concerned before set up of the power unit.
three. Viscosity in the oil shoud be 15~46 cst,as well as oil should be clean and cost-free of impurities,N46 hydraulic oil is recommended.
4. The power unit should be mounted vertically.
five. Check the oil degree during the tank just after the original operating on the electrical power unit.
6. Oil modifying is required immediately after the original a hundred operation hrs,afterwards as soon as each and every 3000 hours.