We examine every piece of bearing by ourselves prior to delivery.
Overview
Swift Particulars
- Applicable Industries:
-
Manufacturing Plant
- Brand Name:
-
OEM
- OEM Provider:
-
Help
- Tolerance:
-
.01-.05mm or Personalized
- Certification:
-
ISO9001, SGS
- Floor Treatment:
-
Sandblasting,Sprucing,Anodize, Zinc,Nickel,Chrome,Plating, etc.
- Application:
-
Car,Healthcare Equipments,Electric powered Equipment,Components,and so on.
- Dimension:
-
As Customers’ Request
- Equipment:
-
Milling/Lathe/Drilling/Four/Three Axis CNC Machining Center
- Drawing Structure:
-
Pro/E, Auto CAD, Solid Performs,IGS,UG, CAD/CAM/CAE
Source Capability
- Provide Capability:
- ten thousand Piece/Parts per Thirty day period
Packaging & Shipping and delivery
- Port
- nb
-
Lead Time
: -
Quantity(Items) 1 – 500 >500 Est. Time(days) 30 To be negotiated
Online Customization
Expert Manufacturer Large Engineering cnc spare components metallic spur equipment
Item Description
Product Type | CNC turning, milling, drilling, grinding, wire EDM cutting and so on. |
Our Services | CNC Machining,Plastic Injection,Stamping,Die Casting,Silicone And Rubber,Aluminum Extrusion,Mould Creating,etc |
Material | Aluminum,Brass,Stainless Metal,Copper,Plastic,Wood,Silicone,Rubber,Or as per the customers’ demands |
Surface Remedy |
Anodizing,Sandblasting,Portray,Powder coating,Plating,Silk Printing,Brushing,Sprucing,Laser Engraving |
Dimension | As customers’ ask for |
Service Task | To supply manufacturing design, manufacturing and technical provider, mould development and processing, and so on |
Drawing Format: | PRO/E, Auto CAD, Solid Works,IGS,UG, CAD/CAM/CAE |
Testing Machine | Digital Peak Gauge, caliper, Coordinate measuring equipment, projection equipment, roughness tester, hardness tester and so on |
Industry used | Machinery hefty duty gear electronic system Vehicle spare areas optical telecommunication |
Packing | Eco-helpful pp bag / EPE Foam /Carton packing containers or picket boxes As customer’s specific specifications |
Trial sample time | 7-ten days right after confirmation |
Delivery time | 7-30 times after receive the pre-payments |
Payment Terms | T/T,Western Union,Paypal |
Much more services
More Generation Element
Area Treatment
Manufacturing Procedure
Why Us